The Project
This project involved the preparation and redecoration of the full length of the main elevation of the building – including the masonry wall, roller shutter doors and the metal windows.
Date
February - 2017
Duration
2 weeks
Specification
The wall, doors and windows all had to be thoroughly prepared before any paint could be applied. Old flaking paint was removed, the doors degreased and missing putty in the window frames replaced.
The use of the same colour for both the wall and the doors gave the exterior a professional and uniform feel whilst the contrasting black colour used to highlight the plinth band gave the building an overall slick and modern look. Graphics were then applied to the entrance, enhancing the buildings appearance further.