The Project

Following a review, 2 new Zebra Crossings were installed in a warehouse to provide added safety to site pedestrians.

Safety works undertaken at Smith and Nephew Hull warehouse. Installing two new Zebra crossings. Over a weekend shut down ensuring minimum disruption to production.

Date

November - 2018

Duration

2 days

Specification

We used a one coat epoxy power float floor primer followed by two coats of Rust-O-Thane 9200WB floor paint to achieve a heavy duty floor paint finish which will withstand long lasting pedestrian traffic.