The Project
Our contract was to fully redecorate the schools’ toilets as part of a larger maintenance scheme. The existing toilets were quite run down and the wall tiles had been replaced numerous times and looked dated.
Date
July - 2008
Duration
2 weeks
Specification
The walls were given an Ilumitex seamless multi-coloured wall finish that was sprayed on and finished in a heavy duty lacquer, including the old ceramic wall tiles which had to be primed with an adhesion promoting tile primer.