The Project
A full internal decoration of the main library was a challenge as all the books were left on the shelves throughout the work. The books were carefully protected by polythene sheeting before work began. The narrow aisles between the bookcases made access to the surfaces difficult. Great care was also needed when erecting and taking down mobile scaffolding towers.
Date
July - 2005
Duration
6 weeks
Specification
Whilst normal emulsion and alkyd paints were used on this job, great care was taken to find an exact match to the heritage colour scheme.