Need a quote?
Call: 01482 329 007

Farmhouse Dwelling

The Project

Complete internal decoration of a new 2 storey farm house with a stunning main staircase.

Date

November - 2013

Duration

6 weeks

Specification

The specification was chosen to keep in line with the very environmentally friendly specification that the building was constructed to. Ecos paints were used which were 100% water based with a variety of finishes used throughout, including a feng-shui finish on the timber staircase balustrades. Feature shades used included dramatic period colours offset with clinical white woodwork trims.

The colours included feature shades with dramatic period colours, aesthetically enhanced and offset by the use of white woodwork trims.

Like what you see?