Before
After

Project Facts

Project

Driffield Junior School, East Yorkshire as part of a refurbishment by Hall Building Ltd

Work Carried Out

School summer holidays 2008.

Duration of Contract

2 weeks.

Case Study - Education

Driffield Junior School
Toilet Refurbishment

This two week project was carried out in the summer holidays as part of a refurbishment by Hall Building Ltd.

Project description

Our contract was to fully redecorate the schools’ toilets as part of a larger maintenance scheme. The existing toilets were quite run down and the wall tiles had been replaced numerous times and looked dated.

Specification

The walls were given an Ilumitex seamless multi-coloured wall finish that was sprayed on and finished in a heavy duty lacquer, including the old ceramic wall tiles which had to be primed with an adhesion promoting tile primer.